We are a global management consultancy that delivers exceptional outcomes and sustainable change

We are a global management consultancy that delivers exceptional outcomes and sustainable change

Case Studies

Mine Planning – Attainment and Adherence

January 6, 2022 | No related items found.

Related Services

Related Industry

Share This Article

Our client, one of the world’s leading mid-tier gold mining company.

Key Results

Plan Attainment

7%

Improvement over the last 4 months

8%

Improvement over the last 4 weeks

Plan Adherence

13%

Improvement over the last 4 months

11%

Improvement over the last 4 weeks

The challenge

Plan Attainment tells us how many of our planned tons were mined. Plan Adherence tells us if those tons were mined from the correct location. Mining in the correct location allows the Process Plant to maximize the recovery of gold. It also reduces unnecessary equipment movement in the pits and keeps our Drills, Dozers, Loaders and Haul Trucks synchronized. Eliminating unplanned equipment movements also creates a safer working environment.

The IAMALLIN Team created an Opportunity Matrix to define and rank reasons for variance such as equipment downtime and how we manage water in the pits due to the heavy rainfall in Suriname. More than a dozen reasons for variance were ranked based on the impact to moving tons and producing gold ounces.

These challenges are topics of focus in our daily leadership meetings and shared in our shift lineout meetings. Members of Planning, Operations, and Maintenance are now conducting weekly trips through the pits, working as one team, to ensure we manage our challenges as soon as possible and to escalate decisions if needed.

* We take client confidentiality seriously. While we have kept the brand anonymous, the results are real.

Further Reading

Operational Excellence

Case Studies

2025/04/24
Thai steel manufacturer achieves cost savings and efficiency through strategic sourcing practices

Operational Excellence

Case Studies

2025/04/24
Philippine thrift bank slashes customer in-branch wait times by 70% via MCS implementation

Organisational Effectiveness

Case Studies

2025/04/24
Indian steel manufacturer undergoes organisational restructuring with manpower optimisation

Operational Excellence

Case Studies

2025/04/24
Indian food manufacturer drives 60% order fulfilment improvement through production efficiency

Operational Excellence

Case Studies

2025/04/24
Data-driven strategies transform delivery performance with 90% fulfilment rate for Filipino logistics company

Organisational Effectiveness

Case Studies

2025/04/24
$1M savings through organisational efficiency in tin manufacturing

Operational Excellence

Case Studies

2025/04/24
Renoir Focus Process® and plant de-bottlenecking yield 23% surge in throughput for aluminium manufacturer

Operational Excellence

Case Studies

2025/04/24
Drilling contractor cuts costs by $22M through supply chain transformation