Mine Operations – Reducing Wait Time

2022/01/06

Our client, one of the world’s leading mid-tier gold mining company.

Key Results

Loaders waiting for Trucks

4%

Improvement over the last 4 months

12%

Improvement over the last 4 weeks

Trucks waiting for Loaders

10%

Improvement over the last 4 months

16%

Improvement over the last 4 weeks

The challenge

In the pits we must carefully balance the number of trucks assigned to each Shovel (or “Loading Unit”). If the Shovel does not have enough Haul Trucks, it cannot be fully productive. If it has too many, then the Haul Trucks are not productive.

Rosebel’s Dispatch Office is where this balance of equipment is measured. The cycle of each Haul Truck is monitored in real-time from the location where it is loaded, the route it travels (roads and ramps), where it is dumping, and the return path to the next load. Dispatchers work with Mine Operations and Mine Planning to optimize these movements in a way that reduces traffic and waiting time for both fleets: the Loading Units and the Haul Trucks.

Operators, Supervisors and General Foremen communicate with Dispatchers throughout the shift to share information on road conditions, visibility and equipment maintenance considerations. Orchestrating this balance of fleets in a safe and efficient manner is truly a Team effort

* We take client confidentiality seriously. While we have kept the brand anonymous, the results are real.

Share This Case Study

How We Can Help

Related Industry

Share this case study

Other case studies

ESG

Posts

2023/09/26
What you need to know about Carbon Border Adjustment Mechanism (CBAM)

Operational Excellence

Case Studies

2023/09/26
Palm oil company increases daily fruit harvest by 11% with Management Control System

Operational Excellence

Case Studies

2023/09/26
Seafood company sees 30% reduction in refit time for its fishing vessel

Case Studies

Implementation

A utilities company improves productivity and saves costs
13 Jun 2022

Case Studies

Organisational Effectiveness

A new level of operational productivity – in just 35 weeks
26 May 2023

Case Studies

Operational Excellence

Maximizing Business Outcomes through Effective Network Maintenance
27 Mar 2023

Connect with us

Let us work with you to achieve exceptional results.