Our client, one of the world’s leading mid-tier gold mining company.

Key Results

Plan Attainment

7%

Improvement over the last 4 months

8%

Improvement over the last 4 weeks

Plan Adherence

13%

Improvement over the last 4 months

11%

Improvement over the last 4 weeks

The challenge

Plan Attainment tells us how many of our planned tons were mined. Plan Adherence tells us if those tons were mined from the correct location. Mining in the correct location allows the Process Plant to maximize the recovery of gold. It also reduces unnecessary equipment movement in the pits and keeps our Drills, Dozers, Loaders and Haul Trucks synchronized. Eliminating unplanned equipment movements also creates a safer working environment.

The IAMALLIN Team created an Opportunity Matrix to define and rank reasons for variance such as equipment downtime and how we manage water in the pits due to the heavy rainfall in Suriname. More than a dozen reasons for variance were ranked based on the impact to moving tons and producing gold ounces.

These challenges are topics of focus in our daily leadership meetings and shared in our shift lineout meetings. Members of Planning, Operations, and Maintenance are now conducting weekly trips through the pits, working as one team, to ensure we manage our challenges as soon as possible and to escalate decisions if needed.

* We take client confidentiality seriously. While we have kept the brand anonymous, the results are real.

Further Reading

Operational Excellence

Case Studies

2025/10/21
Middle Eastern food and beverage company reduces expiry returns to 2.18%, unlocking US$839K in value

Operational Excellence

Case Studies

2025/10/16
How a global oil and gas company reduced maintenance backlogs by 30%

Operational Excellence

Case Studies

2025/10/16
24% OEE and 22% Productivity gains for Asian leading wood panel manufacturer

Operational Excellence

Posts

2025/10/10
How to Measure and Improve Shop Floor Productivity to Drive Manufacturing Growth

Digital Transformation

Case Studies

2025/10/10
Brazilian energy provider reduces manual workload by 16% after process automation 

Operational Excellence

Case Studies

2025/10/10
India’s Leading CDMO Overhauls Systems, Driving Operational Excellence

Operational Excellence

Case Studies

2025/10/09
Tractor Manufacturer Achieves 40% Increase in Average First Pass Yield

Operational Excellence

Case Studies

2025/10/09
Webbing Maker: 30% Waste Reduction. Better Quality Product