Our client, one of the world’s lead­ing mid-tier gold min­ing company.

Key Results 

40% 

Poten­tial Improve­ment Hard Rock Tons per Hour at Gyra­to­ry Crusher 

Opti­miz­ing our Process Plant begins with man­ag­ing the sizes of the ore at the dif­fer­ent stages of the process. This begins with the larg­er size ore being deliv­ered by Haul Trucks from the mine to the very fine par­ti­cle size required to recov­er the gold from the ore.

At the ini­tial stage, the open­ing of the Gyra­to­ry Crush­er was reduced from 6.0 inch­es to 4.5 inch­es. The open­ing at the Sec­ondary Crush­er was reduced to 1.5 inch­es. The Apron Feed­er, anoth­er com­po­nent ear­ly in the process, has been rebuilt increas­ing a test­ed capac­i­ty from 1,200 to 1,700 tons per hour. The repair on the tun­nel also now enables the speed increase of the Apron Feed­er from 65% to 75%.

In addi­tion to the increased process capac­i­ty, less ener­gy is required which reduces our costs and helps the envi­ron­ment.
Also, a refur­bished rock break­er is cur­rent­ly being installed to reduce down­time and increase throughput.

Ele­ments

  1. Man­ag­ing the “F80” / size of ore feed­ing into the Plant
  2. Man­ag­ing the CV2 con­vey­or (Hard Rock) and CV3 con­vey­or (Soft Rock)
  3. Replaced the Head Pul­ley for less slip­page and less lagging
  4. Poten­tial now to process dai­ly demand of ore in 12 hours using two 777s and one 993LU for improved blending
  5. Refur­bished rock break­er now being installed

* We take client con­fi­den­tial­i­ty seri­ous­ly. While we have kept the brand anony­mous, the results are real.

Share This Case Study

How We Can Help

Related Industry

Share this case study

Other case studies

Oper­a­tional Excellence

Case Studies

2022/01/06
Ware­house and Inven­to­ry – Optimization

Oper­a­tional Excellence

Case Studies

2022/02/09
A stain­less steel man­u­fac­tur­er increased its over­all month­ly pro­duc­tion by 16% in less than 6 months

Oper­a­tional Excellence

Case Studies

2023/03/19
Achiev­ing Oper­a­tional Excel­lence in the Hydro­elec­tric Industry

Case Studies

Organ­i­sa­tion­al Effectiveness

Opti­mis­ing the patient expe­ri­ence in just 15 weeks
26 May 2023

Case Studies

A multi­na­tion­al con­glom­er­ate improved asset pro­duc­tiv­i­ty and trans­formed its con­tract man­age­ment process­es — in just 26 weeks
27 Mar 2023

Case Studies

Rev­enue Growth

How we helped a leader in oil & gas to embark on an ambi­tious busi­ness trans­for­ma­tion journey
30 Mar 2023

Connect with us

Let us work with you to achieve exceptional results.