We are a global management consultancy that delivers exceptional outcomes and sustainable change

Case Studies

Reduce Operating Costs with Optimized Performance Management

October 9, 2023 | Operational Excellence

Related Services

Related Industry

Share This Article

At a Glance

The project was developed and implemented in a 25-week period to deliver improvements in their management control systems, namely:

  • Increased productivity of manpower and equipment.
  • Leasing expense reduction and vehicle maintenance.
  • Reduction of the costs associated with contractors.

Background

The client is one of South America’s largest private sanitation groups that develops solutions to preserve natural resources and improve people’s quality of life through its operations. Since 2011, it has established segments in water and sewage, utilities and waste, with a provision of water supply and sanitation services in 47 municipalities.

The Challenge

After successful implementation in one of the client’s previous units, Renoir was hired to assist their management team in identifying and implementing process improvements, making it possible to increase the productivity of field teams, increase service levels and reduce operating costs to preserve its margin. As a result of field analysis, the scope was focused on three areas – Water and Sewers Network Maintenance, Billing and Contractors Management.

What We Did

Our program and project schedule was clearly oriented around 3 important goals:

Increase productivity of manpower and equipment

Network management was improved by reorganizing the client’s equipment and maintenance management processes, aiming to fulfill requirements more efficiently, increasing productivity and maximizing operational reliability. The result was that their volume losses were significantly reduced.

Lease expense reduction and vehicle maintenance

Through close collaboration between Renoir and the client’s teams, an updated productivity management system was developed to support commercial field agents, improving the effectiveness of collection actions and identifying irregularities more quickly.

Reduce the costs associated with contractors

A management model was developed, focusing on improving the productivity of the operations teams, particularly in reviewing compliance of the required service levels and concessions made. Additionally, the team redesigned internal and administrative processes, resizing and balancing activities and work schedules to reduce services demand.

Results

The tools and routines that were created enabled additional control over the processes, which were supported with specific and clearly defined KPIs, enabling management to make swift decisions based on data.

With the systems and indicators installed, focus was turned toward effective running of key meetings to establish appropriate forums to discuss results, define root causes and corrective actions on a daily basis. Over the course of the project, the following system deliverables were met:

  • Implementation of a management control system with appropriate key performance indicators.
  • Transfer of knowledge, toolbox and systems with desired behavioral changes across the operational teams.
  • Improved management capability and confidence in meeting established objectives and project milestones.
  • Well-defined roles and responsibilities for all the operational functions and support services.
  • Management training and rollout of all developed systems, processes and practices.
  • Transfer of all systems and processes related to activity planning, control and reporting, within the integrated management control system.

Sustaining Long-Term Change

The objectives of the project were qualified and quantified in collaboration and agreement between parties, in accordance with Renoir’s methodology. This has ensured that from the beginning of the project, the objectives were clearly defined, providing a greater sense of ownership of the identified benefits. It was developed with the participation of staff from the finance department, benchmarking a model that allowed reliability and security in proving such benefits.

Some of the benefits obtained out of the partnership between the client and Renoir were as follows:


Impact 


Deliverables 


Validated Benefits 

Manpower 

Weekly automated report generation (productivity and overtime) 

Cost savings – 15% 

Field team productivity  

Utilization, efficiency, and productivity of team management 

15% Productivity improvement 

Costs associated vehicle and equipment 

Dimensioning of vehicles equipment and displacement control 

15% reduction of fuel costs and 6% reduction in the cost of vehicle fleet  

Outsourced security services, cleaning and temporary labor contract 

Renegotiation of contracts, payment audits, and new sheet for control and verification of measurements 

6% reduction in the value of contracts 

Electromechanical – compliance with preventive maintenance 

Utilization, efficiency, and productivity of team management 

12% increase in productivity of teams, reaching 100% in preventative water system and 60% in the sewage system 

Commercial and physical losses 

Planning, dimensioning and balancing of commercial agents and vehicles 

Backlog reduction until the end of April 

“The Renoir Methodology ensured that, from the beginning of the project, the objectives were clearly defined which in turn provided greater sense of ownership of the identified benefits.”

Site Director

Key Results

4:1

Return on Investment

15%

increase in productivity of field teams

15%

reduction in manpower costs

15%

reduction in fuel costs

6%

reduction in fleet costs

Further Reading

Operational Excellence

Case Studies

2024/08/27
Rotating Equipment Management Improves in LNG Plant

Operational Excellence

Case Studies

2024/08/27
Turnaround effectiveness improves for LNG plant with clarified KPIs

Operational Excellence

Case Studies

2024/08/15
Refinery reduces total maintenance downtime by 25%

Operational Excellence

Case Studies

2024/08/12
Oil refinery increases throughput by 34%

Operational Excellence

Case Studies

2024/08/09
Aviation fuel company reduces maintenance backlog by 28%

Operational Excellence

Case Studies

2024/08/02
Medical centre cuts delay, adds annual operating room hours by 5,500

Operational Excellence

Case Studies

2024/03/04
Leading drilling company achieves US$75mil in savings after culture overhaul

Operational Excellence

Case Studies

2024/02/20
Refinery improves maintenance efficiency, drives US$36.48M business growth